In Part 8 the base cabinets and the island went in: level, joined and anchored. Today the upper cabinets go up, and then the finishing pieces that make a set of boxes look like built-in furniture.
Upper cabinets have a different job from base cabinets. Nothing holds them up from below. A loaded wall cabinet full of plates and glassware can easily carry well over a hundred pounds, all of it hanging on screws. Hanging them right is a safety job first and a looks job second.
Step 1: Set the height
- Standard spacing. The bottom of the upper cabinets usually sits 18 inches above the countertop. With a 36 inch counter, that puts the bottom of the uppers at 54 inches from the finished floor.
- Check the backsplash and outlets. The height is checked against the backsplash plan and the outlet boxes from Part 3, so outlets do not end up cut in half by the cabinet bottom or the light rail.
- Check the ceiling. If the cabinets go to the ceiling, the ceiling height we measured in Part 1 decides whether we need a filler strip or crown molding to close the gap at the top, because ceilings are rarely level.
- Range hood and microwave. The space over the range is set by the hood manufacturer’s minimum and maximum height above the cooktop. Over-the-range microwaves have their own required opening.
A level line is drawn across every wall at the bottom of the uppers. Just like the bases, every upper is set to this line.
Step 2: A ledger board to hold the weight while we work
We screw a straight, temporary ledger board to the wall with its top edge on the level line. The upper cabinets rest on it while they are leveled and screwed. It keeps the boxes in line and keeps nobody holding a cabinet over their head while someone else drives screws. The ledger comes off once the cabinets are secured, and the screw holes are hidden behind the backsplash.
Step 3: Screw into framing, never only into drywall
- Find every stud and the blocking from Part 4. The marks we left on the walls tell the crew exactly where the framing is.
- Screw through the hanging rails. Each cabinet has a solid rail at the top and bottom of its back. Cabinet screws go through those rails into studs or blocking, at the top and the bottom.
- Never through the thin back panel alone. The back panel of many cabinets is thin. A screw through only the panel can pull through under load.
- Shim behind the rails where the wall is not flat, so tightening the screw does not twist the box.
On concrete block exterior walls, which are common in South Florida homes, the cabinets are fastened to the wood furring or blocking added in Part 4, or with anchors rated for masonry. A drywall anchor alone is never enough for a kitchen cabinet.
Step 4: Start in the corner and work out
Like the bases, the uppers start at the corner. The corner cabinet is set on the ledger, leveled, plumbed and screwed. Each next cabinet is clamped to its neighbor so the face frames are flush at the front and bottom, joined with connector screws, and only then screwed to the wall.
We check with a long level along the bottoms and a straightedge across the faces every few cabinets. On an upper run, a small step between two cabinets is easy to see when you stand at the counter.
Step 5: Fillers and scribes
Walls are not perfectly straight or square. Fillers are the strips that close the space between a cabinet and a wall, and they also give doors and drawers room to open.
- Scribing. A filler next to a wall is scribed: its edge is traced and cut to follow the exact shape of the wall, so there is no tapering gap from top to bottom.
- Clearance. At a corner or next to the refrigerator, the filler is wide enough that a door can open fully and the hardware does not hit the next cabinet or the fridge handle.
- Fastening. Fillers are attached from the inside of the cabinet with screws, so no fasteners show on the face.
Step 6: End panels and appliance panels
Any cabinet side that will be seen, at the end of a run, next to the refrigerator or on the island, gets a finished panel. Factory cabinet sides are often not meant to be on display.
- End panels are scribed to the wall and the floor, then fastened from inside the cabinet.
- Refrigerator panels are set plumb and tall, with enough space for the fridge to slide in and for the doors to swing open.
- Island panels cover the back and ends of the island, especially on the seating side where knees and stools will rub them.
Step 7: Crown molding and light rail
- Crown molding. Where cabinets go to or near the ceiling, crown molding closes the space and finishes the top. On an uneven ceiling, the crown is set level along the cabinets, and the small gap at the ceiling is handled with a scribe piece, so the cabinets look level even if the ceiling is not.
- Miters. Outside corners are mitered, glued and pinned. Inside corners are coped or mitered depending on the profile, so the joint stays tight as the house moves with humidity.
- Light rail. A small molding under the upper cabinets hides under-cabinet light fixtures and the glare from them. It is installed after the lighting wiring is confirmed at the boxes left in Part 3.
Step 8: Doors, drawers and hardware
- Adjust the doors. Modern cabinet hinges adjust in three directions. Every door is adjusted so the gaps between doors are even, the tops line up across the run, and no door rubs its neighbor.
- Adjust the drawers. Drawer fronts are aligned with the doors above and beside them.
- Hardware. Knobs and pulls are installed with a drilling template, so every pull sits at exactly the same position on every door and drawer. We drill from the front with a backer block behind the door, so the wood does not splinter on the inside.
- Soft-close check. Every door and drawer is opened and closed to confirm the soft-close mechanism works.
Step 9: Final check before the countertop template
- Uppers level, aligned with each other and screwed to framing at top and bottom.
- Ledger boards removed.
- Fillers and panels tight to walls and floor.
- Hood and microwave openings at the manufacturer’s dimensions.
- Doors and drawers adjusted, hardware straight.
- Cabinets clean and protected, since the countertop crew comes next.
Frequently asked questions
How high should upper cabinets be above the counter?
Usually 18 inches above a standard 36 inch counter, which puts the bottom of the uppers 54 inches from the floor. The range hood height follows the hood manufacturer’s requirements.
What holds upper cabinets on the wall?
Cabinet screws through the solid hanging rails into studs or blocking at the top and bottom of each cabinet. Never drywall anchors alone.
What are cabinet fillers for?
They close the space between a cabinet and a wall and give doors and drawers room to open without hitting the wall or an appliance.
Why are some cabinets finished with panels?
Any side of a cabinet that will be seen, like the end of a run or the island, gets a finished panel so it looks like furniture instead of a raw cabinet side.
When are knobs and pulls installed?
After the doors and drawers are adjusted. A drilling template keeps every pull in exactly the same position.
What comes next
The cabinets are finished. In Part 10 the countertop shop comes to template the stone on the real cabinets, and we explain what happens at the fabricator before installation day.