In Part 1 we made the selections, measured the room and set the order of work. Before anything comes off the wall, the rest of the house is protected and the bathroom is shut down.
Bathroom demolition is loud and dusty in a small space. Tile is broken off walls with hammers and chisels, mortar beds are chipped, and old cement board is cut. Most bathrooms open onto a bedroom or a hallway with carpet or wood floors. Protection is what keeps a bathroom job from becoming a whole-house cleaning job.
Step 1: Plan the second bathroom
The family will be without this bathroom for several weeks. Before we start, we confirm which bathroom the family will use and, if the remodeled bathroom is the only one with a tub or shower, we plan the schedule so the shower stage moves as fast as the waterproofing cure allows. In a house with one bathroom, we discuss options before day one, not on day one.
Step 2: Protect the path
- Floor protection board along the full path from the entry to the bathroom, taped at the seams.
- Carpet film where the path crosses carpet. It is a self-adhesive plastic made for carpet that comes off clean.
- Door jambs and corners along the path are covered with guards. Tubs, vanities and bags of broken tile go out that way.
- The bathroom door is removed and stored safely, or protected if it stays.
Step 3: Seal the dust
- A dust wall with a zipper door at the bathroom entrance, or at the bedroom entrance for a primary bathroom, so the bedroom is not part of the dust zone.
- Bedroom furniture near the bathroom is covered with plastic taped at the bottom.
- The AC return. If there is a return vent in the bedroom or hallway next to the bathroom, it is covered, and the supply register in the bathroom is sealed. In South Florida the AC runs nearly all year, and tile dust in the air handler is an expensive cleanup.
- The exhaust fan in the bathroom is covered, so it does not pull dust into the attic duct.
Step 4: Shut off water and power safely
- Water. We close the supply valves at the toilet and the vanity, and the shower valve is isolated. In many older homes the shower has no separate shut-off, so the main water is closed while the shower lines are cut and capped. We test that the caps hold before the main is reopened for the rest of the house.
- Toilet. The toilet is drained, removed, and the drain opening is plugged with a rag or a test cap right away. An open toilet drain lets sewer gas into the house and invites debris to fall in.
- Electrical. The bathroom circuits are turned off at the panel and labeled. Every outlet, light and fan is tested with a voltage tester before any wire is disconnected.
Step 5: Check before breaking
Before demolition, we look for what could be inside the walls and floor:
- Old materials. In homes built before the 1980s, some older tile adhesives, joint compounds and flooring materials may contain asbestos. If there is any doubt, a sample is tested before demolition, and the work plan follows the result.
- Wiring in the walls. We note where wires likely run from the outlet and switch locations, so cuts in the drywall do not hit them.
- Pipes in the floor and walls. We mark where supply and drain lines likely run before any saw or chisel goes in.
Step 6: Condos and townhomes
In a condo, bathroom remodeling has extra steps that start before day one: the building’s work hours, elevator reservation with pads, protecting the hallway, and coordinating any water shut-off that affects neighbors. Some buildings also require a sound underlayment under new floor tile. We confirm these rules with the building before the first day.
What protection looks like during the job
Every day the zipper door stays closed, the path is vacuumed, and debris goes out in sealed bags along the protected path. Protection stays in place until the final cleaning in Part 14.
Frequently asked questions
Can we live at home during a bathroom remodel?
Usually yes, if there is a second bathroom. The work area is sealed and the rest of the house stays livable.
Why is the toilet drain plugged right away?
An open drain lets sewer gas into the house and debris into the pipe. It is plugged as soon as the toilet comes out.
What if the shower has no shut-off valve?
The main water is closed while the shower lines are cut and capped, then the main is reopened for the rest of the house.
Do condo bathrooms need extra steps?
Yes. Work hours, elevator reservations, hallway protection and water shut-offs are coordinated with the building before demolition.
What comes next
In Part 3 we take the bathroom down to the studs and answer a question we hear often: can new tile go over old tile?
Planning a bathroom remodel in Deerfield Beach or nearby? See our bathroom remodeling page or schedule a site visit with Edgar at stronghandsflpro.com/contact or (754) 261-2153.