Shower walls with red liquid waterproofing membrane before tile

The shower pan is shaped and sloped, as we covered in Part 8. Now comes the step that decides whether the shower lasts thirty years or starts leaking in three: waterproofing.

Why tile showers leak

Most people assume tile and grout keep water out. They do not. Grout is porous, and even the best grout lets some water pass. Tile cracks, sealant joints age, and water finds every gap. In a well-built shower, that does not matter, because a continuous waterproof layer under the tile catches the water and sends it to the drain. In a leaking shower, that layer is missing, broken or not connected to the drain.

That is why we waterproof the whole shower, floor and walls, as one continuous system before any tile goes on.

Step 1: Backer board on the walls

Step 2: Choose the membrane system

There are two main types. We use one complete system from one manufacturer, so every part is tested to work together.

Step 3: The details are where showers fail

The flat areas of a wall are easy. Leaks come from the details, so we treat each one before the main coats:

Step 4: The niche

A niche is a box cut into a waterproof wall, so it has six surfaces and many corners.

Step 5: The bench

The bench top and front are waterproofed as part of the wall and floor, with the top sloped slightly toward the shower. A bench is a horizontal surface inside a wet area, so it gets the same care as the floor.

Step 6: Cover the whole shower

With the details done, the membrane goes on every surface:

Step 7: Cure

Liquid membranes need time to cure before the flood test and tile. Depending on the product, the temperature and the humidity, that is usually a few hours between coats and up to a day or more before testing. In humid South Florida conditions we follow the longer end of the range. This is not the step to rush.

Can you tile over a shower pan?

A preformed acrylic or fiberglass shower pan is a finished surface and is not meant to be tiled over. A mortar bed or a foam tray, as in Part 8, is the base for tile, and it is waterproofed first. What should never happen is tile set on a pan with no membrane connected to the drain.

Frequently asked questions

How do you waterproof a shower before tiling?

Backer board on the walls, then a continuous membrane on the floor, walls, niche, bench and curb, with every corner, seam, pipe and the drain connection treated as part of one system.

Why do tile showers leak?

Because tile and grout are not waterproof. When the membrane underneath is missing, broken or not connected to the drain, water reaches the wall and the framing.

How long does shower waterproofing take to cure?

Usually from several hours to a day or more, depending on the product and humidity. We follow the maker’s instructions before the flood test.

How is a shower niche waterproofed?

Every face of the niche is covered with the membrane, the inside corners are reinforced, and the bottom slopes toward the shower.

What comes next

In Part 10, before any tile is set, we test the waterproofing: we fill the shower with water and leave it for 24 hours.

Planning a bathroom remodel in Boca Raton or nearby? See our bathroom remodeling page or schedule a site visit with Edgar at stronghandsflpro.com/contact or (754) 261-2153.