Bathroom with tiled shower and window before remodel work continues

In Part 1 we made the selections, measured the room and set the order of work. Before anything comes off the wall, the rest of the house is protected and the bathroom is shut down.

Bathroom demolition is loud and dusty in a small space. Tile is broken off walls with hammers and chisels, mortar beds are chipped, and old cement board is cut. Most bathrooms open onto a bedroom or a hallway with carpet or wood floors. Protection is what keeps a bathroom job from becoming a whole-house cleaning job.

Step 1: Plan the second bathroom

The family will be without this bathroom for several weeks. Before we start, we confirm which bathroom the family will use and, if the remodeled bathroom is the only one with a tub or shower, we plan the schedule so the shower stage moves as fast as the waterproofing cure allows. In a house with one bathroom, we discuss options before day one, not on day one.

Step 2: Protect the path

Step 3: Seal the dust

Step 4: Shut off water and power safely

Step 5: Check before breaking

Before demolition, we look for what could be inside the walls and floor:

Step 6: Condos and townhomes

In a condo, bathroom remodeling has extra steps that start before day one: the building’s work hours, elevator reservation with pads, protecting the hallway, and coordinating any water shut-off that affects neighbors. Some buildings also require a sound underlayment under new floor tile. We confirm these rules with the building before the first day.

What protection looks like during the job

Every day the zipper door stays closed, the path is vacuumed, and debris goes out in sealed bags along the protected path. Protection stays in place until the final cleaning in Part 14.

Frequently asked questions

Can we live at home during a bathroom remodel?

Usually yes, if there is a second bathroom. The work area is sealed and the rest of the house stays livable.

Why is the toilet drain plugged right away?

An open drain lets sewer gas into the house and debris into the pipe. It is plugged as soon as the toilet comes out.

What if the shower has no shut-off valve?

The main water is closed while the shower lines are cut and capped, then the main is reopened for the rest of the house.

Do condo bathrooms need extra steps?

Yes. Work hours, elevator reservations, hallway protection and water shut-offs are coordinated with the building before demolition.

What comes next

In Part 3 we take the bathroom down to the studs and answer a question we hear often: can new tile go over old tile?

Planning a bathroom remodel in Deerfield Beach or nearby? See our bathroom remodeling page or schedule a site visit with Edgar at stronghandsflpro.com/contact or (754) 261-2153.