Large-format porcelain tile floor installed during a kitchen remodel

In Part 5 we mapped the slab, ground the high spots, filled the low ones and checked it for moisture. The floor is flat. Now the new tile goes down.

In this series we install the floor before the cabinets. The tile runs wall to wall, under the base cabinets, the dishwasher and the refrigerator. If the layout ever changes, there is no hole in the floor, and the dishwasher and fridge sit at the same height as the finished floor in front of them. It costs a few more boxes of tile, and it saves a lot of trouble later.

Setting a tile floor well is not about speed. It is about three things: a layout that puts the cuts where nobody looks, enough mortar under every tile, and tiles that sit flat against their neighbors. Here is how we do each one.

Step 1: Dry layout before any mortar is mixed

Before a single bag of mortar is opened, we lay out the floor on paper and on the slab.

Then we lay a few rows of tile dry, with spacers, along the main lines. Seeing the real tiles on the real slab catches problems that a drawing misses, such as a wall that runs out of square and makes the last row taper.

Step 2: Snap the control lines

With the layout decided, we snap chalk lines on the slab: one main line along the length of the room and one at a perfect 90 degrees to it. We check the square with the 3-4-5 method, the same one we used to check the corners in Part 1: 3 feet on one line, 4 feet on the other, and the diagonal must read exactly 5 feet. On a big floor we use 6-8-10 for more accuracy.

Every tile in the room is set from those lines. If the lines are right, the grid stays straight from the entry to the far wall.

Step 3: Choose and mix the mortar

The mortar under a tile is what holds it. For the large-format porcelain most South Florida homeowners choose today (24 by 24 inches, 12 by 24, or plank tile up to 48 inches), we use a polymer-modified mortar rated for large and heavy tile. It holds a thicker bed without the tile sinking as it cures.

Step 4: The right trowel and the right technique

Step 5: Set, slide and check coverage

Each tile is placed slightly off its final position and slid about a quarter inch across the ridges, perpendicular to them, to collapse the ridges and spread the mortar. Then it is pressed into place.

The only way to know a tile has full contact is to look. Every so often, especially at the start, we lift a freshly set tile and check the back. For floors, the target is at least 80 percent coverage, and for large-format tile and wet areas we aim for 95 percent, with mortar under all the corners and edges. Empty corners are where tiles crack when a heavy pot or a chair leg lands on them.

Step 6: Leveling clips and lippage

Lippage is the height difference between the edges of two neighboring tiles. You feel it with bare feet and see it when light comes in low across the floor. Large tiles are more prone to it because they are rarely perfectly flat from the factory.

Step 7: Cuts, edges and movement joints

Step 8: Clean as we go

Mortar that squeezes up into the joints is removed before it hardens, so the grout in Part 7 has full depth. The tile faces are wiped clean. Nobody walks on the floor until the mortar has cured enough, usually 24 hours, and the room is closed off with a sign on the door.

How long it takes

A typical kitchen floor with large-format porcelain takes one to two days to set, depending on the size of the room and the number of cuts. Grout and sealing come next, after the mortar has cured.

Frequently asked questions

How much mortar coverage does tile need?

At least 80 percent on a dry floor, and 95 percent for large-format tile and wet areas, with every corner and edge supported. We check by lifting tiles during the install.

Why back-butter large tiles?

The back of a large tile is never perfectly flat. A thin coat of mortar on the back fills those hollows, which is the most reliable way to get full contact.

What is lippage, and how is it avoided?

It is a height difference between neighboring tile edges. We avoid it with a flat slab, back-buttering, a leveling clip system and a short offset on plank tile.

Should the tile go under the cabinets?

In this series, yes. It keeps the floor continuous, keeps the dishwasher and fridge openings at the right height, and makes future changes easier.

When can you walk on new tile?

Usually after about 24 hours, once the mortar has cured enough. Heavy traffic and cabinet installation wait until after grout.

What comes next

The tile is down and cured. In Part 7 we grout the floor, clean off the haze, seal it if the grout needs it and protect it so the cabinet installation can start.

Planning a kitchen remodel in Boca Raton or nearby? See our kitchen remodeling page or schedule a site visit with Edgar at stronghandsflpro.com/contact or (754) 261-2153.