The vanity, toilet and fixtures were installed and tested in Part 13. Two things are left: the shower glass and the handover.
Why shower glass is measured last
Shower glass is cut and tempered at a glass shop to exact dimensions. Once tempered, it cannot be cut or trimmed. Because the finished tile surfaces decide the real opening, and walls are rarely perfectly plumb, the glass is measured only after the tile, grout and sealant are complete. Measuring from framing or from the drawings is how glass ends up with uneven gaps or panels that do not fit.
Step 1: Measure the opening
The glass installer measures the opening at the top, middle and bottom, and checks each wall and the curb for plumb and level. If a wall leans, the panel is made to match it, or the hardware is chosen to absorb the difference. The curb top, sloped slightly into the shower in Part 8, is accounted for so the door seals correctly.
Step 2: Choose the type
- Frameless glass. Thick tempered glass, usually 3/8 or 1/2 inch, held by clips and heavy hinges. Clean and modern, the most requested today.
- Semi-frameless. Thinner glass with a metal frame around the fixed panels and a frameless door.
- Fixed panel, no door. A single panel for walk-in showers, sized so the spray stays inside.
Glass type, hardware finish and clear or low-iron glass were chosen in Part 1, so the blocking for the hinges and clips was already in the walls.
Step 3: Fabrication
Tempered shower glass usually takes one to three weeks to fabricate after measuring. The bathroom is fully usable except for the shower during that time, or the shower can be used carefully with a temporary curtain, depending on the layout.
Step 4: Installation
- Hinges and clips are fastened through the tile into the blocking from Part 5, with holes drilled through the tile with a diamond bit, and each hole sealed so no water gets behind the tile.
- Panels are set on setting blocks, plumbed and leveled.
- Seals and sweeps. Clear vinyl seals on the door edges and a sweep at the bottom keep water in.
- Silicone. Fixed panels are sealed to the tile and curb with clear silicone and left to cure before the shower is used, usually 24 hours.
- Door swing. The door is adjusted to close smoothly and to open outward, away from the shower, as is standard.
Step 5: Cleaning
As in the kitchen series, the bathroom gets a full post-construction clean, top to bottom: the exhaust fan grille, light fixtures, mirror, vanity inside and out, tile and grout haze, glass, fixtures and floor. The AC return and supply vents that were covered in Part 2 are uncovered and cleaned. Only then does the protection along the path come up.
Step 6: Our inspection, then the walkthrough
Edgar walks the bathroom alone first with a light held low across the tile, looking for lippage, haze, missing sealant, chips and scuffs. Then we walk it with the homeowner: run the shower and check the glass seals, open every drawer, flush the toilet, test the fan and the GFCI outlets.
Step 7: The punch list and handover
Anything found goes on a written punch list with its location. Every item is fixed and checked again. The job is finished when the list is closed.
At handover, the homeowner receives:
- Care instructions for the grout, the glass and the vanity finish, including which cleaners are safe and whether grout needs resealing.
- Warranty papers and manuals for the valve, fixtures, toilet and fan.
- Leftover tile and grout, labeled for future repairs.
- Shut-off locations for the toilet, the vanity and the main water.
Looking back: how long does a bathroom remodel take?
For a typical full bathroom with a tile shower, once the vanity and tile are on hand:
- Planning and ordering (Part 1): before work starts.
- Protection and demolition (Parts 2 and 3): 1 to 2 days.
- Repairs behind the walls (Part 4): 1 day to a week, depending on what is found and drying time.
- Plumbing, drains and electrical (Parts 5, 6 and 7): 2 to 5 days, more if drains move on the slab.
- Shower pan, waterproofing and flood test (Parts 8, 9 and 10): 3 to 5 days with cure times.
- Wall and floor tile, grout (Parts 11 and 12): 4 to 7 days.
- Vanity, toilet and fixtures (Part 13): 1 to 2 days.
- Glass, cleaning and walkthrough (this part): 1 to 2 days, after 1 to 3 weeks of glass fabrication.
In total, three to five weeks of work on site for most full bathrooms, plus the glass fabrication time. The steps that should never be shortened are the waterproofing cure and the flood test.
Frequently asked questions
When is shower glass measured?
After all the tile, grout and sealant are finished, because the finished surfaces decide the real opening and tempered glass cannot be trimmed.
How long does shower glass take?
Usually one to three weeks to fabricate after measuring, and a few hours to install, plus about 24 hours for the silicone to cure.
What is checked in a bathroom final walkthrough?
Tile and grout, sealant joints, glass seals and door swing, vanity, toilet, faucets, shower temperature, exhaust fan and GFCI outlets.
How long does a full bathroom remodel take?
Usually three to five weeks of work on site for a full bathroom with a tile shower, plus glass fabrication time.
The end of the bathroom series, and what comes next
That completes our bathroom remodel, step by step. If you are thinking about replacing a tub with a walk-in shower, our tub to walk-in shower series covers the details specific to that project.