Frameless glass shower with niche in a remodeled bathroom

The vanity, toilet and fixtures were installed and tested in Part 13. Two things are left: the shower glass and the handover.

Why shower glass is measured last

Shower glass is cut and tempered at a glass shop to exact dimensions. Once tempered, it cannot be cut or trimmed. Because the finished tile surfaces decide the real opening, and walls are rarely perfectly plumb, the glass is measured only after the tile, grout and sealant are complete. Measuring from framing or from the drawings is how glass ends up with uneven gaps or panels that do not fit.

Step 1: Measure the opening

The glass installer measures the opening at the top, middle and bottom, and checks each wall and the curb for plumb and level. If a wall leans, the panel is made to match it, or the hardware is chosen to absorb the difference. The curb top, sloped slightly into the shower in Part 8, is accounted for so the door seals correctly.

Step 2: Choose the type

Glass type, hardware finish and clear or low-iron glass were chosen in Part 1, so the blocking for the hinges and clips was already in the walls.

Step 3: Fabrication

Tempered shower glass usually takes one to three weeks to fabricate after measuring. The bathroom is fully usable except for the shower during that time, or the shower can be used carefully with a temporary curtain, depending on the layout.

Step 4: Installation

Step 5: Cleaning

As in the kitchen series, the bathroom gets a full post-construction clean, top to bottom: the exhaust fan grille, light fixtures, mirror, vanity inside and out, tile and grout haze, glass, fixtures and floor. The AC return and supply vents that were covered in Part 2 are uncovered and cleaned. Only then does the protection along the path come up.

Step 6: Our inspection, then the walkthrough

Edgar walks the bathroom alone first with a light held low across the tile, looking for lippage, haze, missing sealant, chips and scuffs. Then we walk it with the homeowner: run the shower and check the glass seals, open every drawer, flush the toilet, test the fan and the GFCI outlets.

Step 7: The punch list and handover

Anything found goes on a written punch list with its location. Every item is fixed and checked again. The job is finished when the list is closed.

At handover, the homeowner receives:

Looking back: how long does a bathroom remodel take?

For a typical full bathroom with a tile shower, once the vanity and tile are on hand:

  1. Planning and ordering (Part 1): before work starts.
  2. Protection and demolition (Parts 2 and 3): 1 to 2 days.
  3. Repairs behind the walls (Part 4): 1 day to a week, depending on what is found and drying time.
  4. Plumbing, drains and electrical (Parts 5, 6 and 7): 2 to 5 days, more if drains move on the slab.
  5. Shower pan, waterproofing and flood test (Parts 8, 9 and 10): 3 to 5 days with cure times.
  6. Wall and floor tile, grout (Parts 11 and 12): 4 to 7 days.
  7. Vanity, toilet and fixtures (Part 13): 1 to 2 days.
  8. Glass, cleaning and walkthrough (this part): 1 to 2 days, after 1 to 3 weeks of glass fabrication.

In total, three to five weeks of work on site for most full bathrooms, plus the glass fabrication time. The steps that should never be shortened are the waterproofing cure and the flood test.

Frequently asked questions

When is shower glass measured?

After all the tile, grout and sealant are finished, because the finished surfaces decide the real opening and tempered glass cannot be trimmed.

How long does shower glass take?

Usually one to three weeks to fabricate after measuring, and a few hours to install, plus about 24 hours for the silicone to cure.

What is checked in a bathroom final walkthrough?

Tile and grout, sealant joints, glass seals and door swing, vanity, toilet, faucets, shower temperature, exhaust fan and GFCI outlets.

How long does a full bathroom remodel take?

Usually three to five weeks of work on site for a full bathroom with a tile shower, plus glass fabrication time.

The end of the bathroom series, and what comes next

That completes our bathroom remodel, step by step. If you are thinking about replacing a tub with a walk-in shower, our tub to walk-in shower series covers the details specific to that project.

Planning a bathroom remodel in Boca Raton or anywhere in Broward and Palm Beach Counties? See our bathroom remodeling page or schedule a site visit with Edgar at stronghandsflpro.com/contact or (754) 261-2153.