Skip to content
  • (754) 261-2153
  • contact@stronghandsflpro.com
Instagram Facebook
  • Home
  • About Us
  • Our Services
    • Kitchen Remodeling
    • Bathroom Remodeling
    • Whole-Home Remodeling
    • Home Additions
    • Flooring & Tile
    • Interior & Exterior Painting
    • Drywall & Carpentry
    • Roofing
    • Insurance & Storm Repairs
    • Commercial Build-Outs
  • Portfolio
  • Blog
  • Contact
Get My Free Estimate

Archives

Kitchen Remodel, Step by Step (Part 11): Countertop Installation Day, Sink and Overhangs

Kitchen remodel by Strong Hands Construction, photo 8

Installation day is short and precise. Here is how a stone countertop is brought in, set, seamed, attached to an undermount sink and supported at the island overhang.

Kitchen Remodel, Step by Step (Part 10): Templating the Countertop and What Happens at the Fabricator

Kitchen remodel by Strong Hands Construction, photo 54

The countertop is the one part of a kitchen that cannot be adjusted on site. Here is how it is templated on the real cabinets, what gets decided that day and what happens at the fabricator.

Kitchen Remodel, Step by Step (Part 9): Upper Cabinets, Fillers, Panels and Crown

Kitchen remodel by Strong Hands Construction, photo 40

Upper cabinets hang on the wall with nothing under them. Here is how we hang them safely and straight, then finish the details that make cabinets look built in: fillers, panels, crown and hardware.

Kitchen Remodel, Step by Step (Part 8): Setting the Base Cabinets Level and Tight

Kitchen remodel by Strong Hands Construction, photo 41

Base cabinets carry the countertop, the sink and years of daily use. Here is how we set them level, straight and tight on a South Florida kitchen remodel.

Kitchen Remodel, Step by Step (Part 7): Grout, Cleaning and Sealing the New Floor

Bathroom remodel by Strong Hands Construction, photo 49

The tile is set. Grout is what turns a field of tiles into a finished floor. Here is how we grout, clean, seal and protect a new kitchen floor before the cabinets arrive.

Kitchen Remodel, Step by Step (Part 6): Laying Out and Setting the Tile Floor

Large-format marble-look tile floor

The slab is flat. Now the new floor goes down. Here is how we lay out and set a porcelain tile floor in a kitchen remodel, from the first chalk line to the last full tile.

Kitchen Remodel, Step by Step (Part 5): Getting the Floor Flat Before the Cabinets Go In

Kitchen remodel by Strong Hands Construction, photo 20

A kitchen can only be as level as the floor under it. Here is how we check, grind and level a concrete slab on a kitchen remodel in West Palm Beach and across South Florida, and how flooring and cabinets are coordinated.

Kitchen Remodel, Step by Step (Part 4): Straight Walls, Cabinet Blocking and Drywall

Kitchen remodel by Strong Hands Construction, photo 53

Before the drywall goes up, the walls of a kitchen get straightened and reinforced for the cabinets they will carry. Here is how we close the walls on a kitchen remodel in Coral Springs and across Broward and Palm Beach.

Kitchen Remodel, Step by Step (Part 3): Rough Electrical, Plumbing and What Hides Behind the Wall

Kitchen remodel by Strong Hands Construction, photo 28

Once the old kitchen is out, the new one gets built from the inside first: wires, pipes and vents. Here is what rough electrical and plumbing look like on a kitchen remodel in Delray Beach and across South Florida, and what we check before anything gets covered.

Kitchen Remodel, Step by Step (Part 2): Protecting the House and Taking the Old Kitchen Out

Kitchen remodel by Strong Hands Construction, photo 27

Demolition looks like the fast part of a kitchen remodel. Done right, it starts with a day of protecting the rest of the house. Here is how we prepare and take an old kitchen out in Fort Lauderdale and across South Florida.

Bathroom Remodel, Step by Step (Part 14): Shower Glass, Accessories and the Final Walkthrough

Bathroom remodel by Strong Hands Construction, photo 63

The glass is the last thing installed in a shower and the first thing people notice. Here is how it is measured and installed, then how we clean, walk and hand over the finished bathroom.

Bathroom Remodel, Step by Step (Part 13): Vanity, Toilet and Fixtures

Bathroom remodel by Strong Hands Construction, photo 52

The finishes are done. Now the bathroom gets its working parts: the vanity, the toilet, the faucets and the shower trim, each set level, sealed right and tested.

  • ← Previous
  • 1
  • 2
  • 3
  • 4
  • Next →
← Previous
Next →
Strong Hands Construction logo

Premium construction and remodeling, built with precision, quality and total transparency. Spaces that truly stand out.

Instagram Facebook

Quick Links

  • Home
  • About Us
  • Services
  • Portfolio
  • Contact

Services

  • Kitchen Remodeling
  • Bathroom Remodeling
  • Whole-Home Remodeling
  • Home Additions
  • Flooring & Tile
  • Interior & Exterior Painting
  • Drywall & Carpentry
  • Roofing
  • Insurance Repairs
  • Commercial Build-Outs

Contact

  • (754) 261-2153
  • contact@stronghandsflpro.com

© 2026 Strong Hands Construction FL Pro, Inc. All Rights Reserved. Serving Broward & Palm Beach Counties, FL. Hours: Mon to Fri 7am to 6pm, Sat 7am to 12pm.

"Commit your way to the Lord; trust in Him, and He will act." Psalm 37:5

  • Privacy Policy
  • Cookie Policy
  • Cookie Settings